大连斯频德环境设备有限公司
良心品质 服务中国
良心品质 服务中国

The Spindel KG series of large cooling towers fully into the market

2015-12-16 01:00

In recent years, China's economic growth has decreased year by year, and the contradiction between overcapacity and resource mismatch has seriously restricted the development of various industries. Facing the severe market situation and fierce industry competition, Dalian spender environmental equipment Co., Ltd. takes the initiative to seek market breakthrough. Following the official launch of the plant of the clean room project, on the basis of ensuring the continuous improvement of the existing cooling tower products, Dalian spender has filled the product gap of spender with a single cooling ton of 500 ~ 1000 tons by introducing kg series new products, and has also focused on the large-capacity single market. The kg series cooling tower introduced by Dalian spender has passed the American CTI certification and the inspection of the national FRP product quality supervision and inspection center. Its high-efficiency hanging filler, energy saving and environmental protection, water floating rate is 17 times lower than the national standard, and the frame adopts galvanized steel plate, which can also be used as an all steel series. The maximum processing capacity of a single machine can reach 1000 tons, saving space and dealing with various use environments. After the launch of the product, it has greatly attracted the attention of the market. In 2015, Hefei sand ship, the first project of Dalian spender kg series, also entered the history of spender. Since the day of signing the contract, all departments of the company have attached great importance to it. From the early prototype assembly, on-site foundation confirmation, to the inspection and packaging of new products, all departments work together. Because the customer is very tight on the construction period, kg15-484 × 2,KG15-384 × The new product project of 1 requires 20 days to be completed, and the period includes 11 long holidays. At the critical moment, our lovely workers went up. The employees of the company worked overtime continuously to ensure that the products were delivered on time. The personnel assigned to the on-site installation gave up the long holiday, all the parts were in place on October 2, and the hoisting of all parts was completed within 2 days. Due to the large body of kg series cooling tower, the risk during installation is also relatively increased. The safety officer of the company coordinates to rent and build scaffolds on site, and checks the labor protection appliances, safety belts and other devices of on-site workers every day. Hazard identification and KYT finger calling before construction shall be carried out in strict accordance with the requirements of the company. On site technicians, technicians and quality personnel follow the production in the whole process. Read the drawings in the evening, sort out the component drawings and assembly process of the next day's installation progress, and participate in the whole process of on-site installation the next day. Each division of labor shall carefully record the technical problems, process improvement and quality improvement fed back on site, summarize them every day, make summary materials, and sort out the problems and improvement measures encountered in the company's first kg project as the first-hand training materials for the company's technology, installation and quality, including outsourcing processing in the future. On the afternoon of October 21, when the installation director took the customer's signature confirmation form, all the hard work was forgotten and a bright smile appeared on his face. A team leader at the scene sighed and was very happy to see that the monotonous floor had set up its own self-assembled cooling tower in more than ten days. This kind of mood cannot be expressed in words. That mood is like witnessing the growth of your children. In the 19 years since its establishment, the company has created many miracles in on-site installation. This time, there are 20 on-site installation workers, 4 technical, process and quality management personnel, and 24 on-site personnel to complete the new products safely and smoothly with quality and quantity in 20 days. Once again created the history of Dalian spender company.

SERVICE SYSTEM

 

Services system
System
After-sale

 

PRODUCTS

 

Cooling tower
Clean room
Parts show

 

 

 

CONTACT

Add:NO.8,North-East Street 4,Eco.&Tech.Development Zone,Dalian,China

Wechat

Follow Our Public Number