Forge ahead with determination
Release Date:
2018-11-12 15:24
Source:
In August 1996, Zhao Bin joined Dalian Spind Environmental Equipment Co., Ltd. (hereinafter referred to as Dalian Spind). Over the span of more than two decades, the passage of time has tempered his youthful inexperience, imbuing every gesture and decision with maturity, steadiness, and a strong sense of responsibility.
In January 2015, Minister Zhao Bin took over the Production Management Department at Dalian Spindel. With his dedication and passion for his work, he led the manufacturing team, increasing each employee’s monthly production output from RMB 255,000 per person in 2015 to RMB 350,000 per person in 2017—a 37% rise.
In the early stages of the takeover, the company was grappling with a business downturn, and its full-year performance was expected to remain bleak. Manufacturing staff faced challenges such as underutilized workloads, low morale, and reduced incomes. To weather the crisis, cut manufacturing costs, and boost employee earnings, the manufacturing team implemented a workforce‑streamlining initiative by consolidating and optimizing job roles. After more than a month of concerted effort, headcount was reduced by 20%, successfully achieving the goals of lowering manufacturing costs and improving employee compensation.
To achieve accident-free production, at the beginning of each year, manufacturing employees are organized to re‑identify potential hazards and implement a tiered management system. Daily team briefings include KY (hazard prediction) activities, and monthly departmental safety inspections are conducted across manufacturing teams. These initiatives enhance workers’ safety awareness, enabling them to identify and mitigate risks before and during operations, thereby ensuring safe production.
The company’s products are painstakingly crafted by the manufacturing team, piece by piece, and are hard-earned. To meet production deadlines, overtime and shift work are often necessary. During peak periods, Department Head Zhao Bin personally visits the shop floor to assess conditions during overtime and shift changes, promptly addressing any issues he identifies. On one occasion, a continuous‑forming packing‑production line at the packing‑manufacturing station suddenly broke down at 10 p.m. The on‑site operators were unable to resolve the problem. To stay on schedule, that very night he and the equipment‑maintenance team rushed from downtown to the factory in the development zone. After more than two hours of diagnosis, troubleshooting, and repairs, normal production was restored, ensuring timely delivery the next day. By the time they returned to the city, it was well past midnight. Yet the following morning, even before the first workday bell had rung, Department Head Zhao Bin was already out on his rounds, inspecting operations once again.
As corporate product lines evolve, processing equipment is continuously upgraded. In particular, the fabrication of packing— a core component of Dalian Spindel KG and DX cooling towers—could not be handled by Dalian Spindel’s previous machinery and required a continuous‑forming packing production line. However, the equipment manufacturers could only provide automated forming; they did not offer automation for punching or palletizing. Meanwhile, the forming machines operate around the clock, forcing production staff to perform these tasks nonstop, leading to fatigue and frustration. To address this issue and reduce workers’ physical strain, in May 2016 the company organized its process engineers to actively seek out automation equipment suppliers and collaborate with them to define methods and requirements for automated punching and palletizing. After nearly a year of effort, automated punching and palletizing were successfully implemented on the DX and KG05 continuous‑forming lines. Each automated line now saves approximately RMB 120,000 annually and has been granted two utility‑model patents by the China National Intellectual Property Administration.
To enhance on-site management, we conducted 6S training for manufacturing team leaders and actively promoted its implementation. Monthly 6S assessments were carried out, with workplace recognition awarded to outstanding teams. After two years of dedicated effort, the manufacturing floor has undergone significant transformation: production processes have become more streamlined and efficient, and overall productivity has improved by over 30%. While ensuring workplace safety, we have also elevated product quality and boosted production efficiency. In addition, we measured employees’ processing efficiency and linked compensation to performance, enabling higher earnings for greater output and greatly motivating staff to increase their productivity.
Minister Zhao Bin has devoted more than two decades to Dalian Spindel. His indomitable perseverance and relentless drive are truly inspiring, and his story has touched every member of the Spindel family. Through him, we see not only a deep passion for Dalian Spindel’s mission but also a profound sense of responsibility and mission as a Communist Party member. Minister Zhao’s exacting standards for himself have also motivated newly hired employees to study diligently and master their professional expertise. With his own experiences and years of hard work, he has exemplified the spirit of dedicating oneself to one’s chosen field, loving it, and mastering it—faithfully fulfilling his duties and devoting his energy and enthusiasm to the future of Dalian Spindel.
Keywords:
Related News