The Sifengde KG series large cooling towers have been fully launched on the market.
Release Date:
2015-12-29 08:26
Source:
In recent years, China’s economic growth has slowed year after year, and the twin challenges of overcapacity and resource misallocation have severely constrained the development of various industries. Facing a tough market environment and intense industry competition, Dalian Spind Environmental Equipment Co., Ltd. has proactively sought new avenues for market breakthroughs. Following the official launch of its cleanroom‑type plant project, Dalian Spind has, while continuing to refine its existing cooling tower lineup, introduced the new KG series—filling a critical gap in its product range for single‑unit capacities between 500 and 1,000 tons—and simultaneously set its sights on the high‑capacity standalone market segment. The KG series cooling towers recently brought into production by Dalian Spind have earned both U.S. CTI certification and approval from the National Fiberglass Products Quality Supervision and Inspection Center. Featuring highly efficient suspended packing, these units are energy‑efficient and environmentally friendly, with drift rates more than 17 times lower than the national standard. Their frames are constructed from galvanized steel, and a fully steel‑based version is also available. With a maximum single‑unit capacity of up to 1,000 tons, they save space and can adapt to a wide variety of operating conditions. Since their introduction, these products have attracted significant market attention. In 2015, the first KG‑series project—the Hefei Sand Ship facility—marked a milestone in Dalian Spind’s history. From the moment the contract was signed, every department within the company placed great importance on the endeavor. From assembling prototype units and verifying on‑site foundations to inspecting and packaging the new products, all teams worked seamlessly together. Given the client’s extremely tight schedule, the two new KG models—KG15‑484×2 and KG15‑384×1—had to be completed within twenty days, including during the eleven‑day National Day holiday. At this critical juncture, our dedicated workers rose to the challenge: employees worked overtime without pause to ensure timely delivery, while installation personnel voluntarily gave up their holidays, arriving on site by October 2nd and completing the hoisting of all components within just two days. Because the KG series towers are large and relatively complex to install, safety considerations were paramount. The company’s safety officer coordinated on‑site scaffolding rentals and conducted daily inspections of workers’ personal protective equipment, including harnesses and other safety gear. Pre‑installation hazard identification and KYT (Key Risk Identification) procedures were rigorously enforced according to company protocols. On‑site technical, process, and quality personnel remained engaged throughout the entire installation process. Evenings were spent reviewing blueprints, compiling detailed drawings of next‑day assembly steps and refining installation procedures, while the following day they participated fully in on‑site installation activities. Each team meticulously documented field feedback on technical issues, process improvements, and quality enhancements, consolidating findings daily into summary reports. These materials captured the problems encountered during Dalian Spind’s inaugural KG project along with corresponding corrective measures, serving as invaluable first‑hand training resources for future technical, installation, and quality initiatives—including outsourced manufacturing processes. On the afternoon of October 21st, when the installation supervisor held the customer‑signed acceptance document, all previous efforts seemed to fade away, replaced by radiant smiles. One of the on‑site supervisors remarked that watching the once‑monotonous floor transform, within little more than ten days, into a towering cooling tower painstakingly assembled by their own hands filled him with profound joy. Such feelings defy verbal expression—like witnessing one’s child grow into adulthood. Over the past 19 years since its founding, Dalian Spind has repeatedly achieved remarkable feats in on‑site installations. This time, with 20 installation workers and four technical, process, and quality management personnel accompanying the team, a total of 24 people successfully completed the new product rollout safely, on schedule, and to the highest quality standards—all within twenty days. Once again, Dalian Spind has written another chapter in its storied history.
Keywords:
Related News